This 44,000sf building has two 65 ton bridge cranes to accommodate repairs made on large mining equipment. The facility features big open welding bays and incorporated sheeting 55' ft tall.
Laveen School
Erected with precision, Mustang Steel Erectors built Laveen School District a beautiful 22,000SF maintenance and office building that integrates with the rest of the traditional buildings on campus for half the cost!
Agricultural
Whether you're in the chicken, cow, or crop business, Mustang Steel Erectors is here to help you get more covered space at the farm without halting production. We have erected various structures (385,000sf this year to be precise) at multiple locations throughout Arizona.
Family Dollar
Mustang Steel Erectors has been a part of multiple retail centers, both stand alone and multi-tenant facilities. Most recently, our involvement in several Family Dollars across the state of Arizona has allowed us to demonstrate the diversity of finishes a Pre Engineered Metal Building can incorporate.
Sun City West Fire Station for Danson Construction
Mustang Steel Erectors was contracted to erect this STAR Pre Engineered Steel Building for a new fire district in Sun City West. This 56' x 60' design build project included specialty material for a screen wall that was not part of the metal building system.